KUWAIT EPCM PROJECT FOR: GAS BOOSTER STATION (BS-180) - APRIL 2017 TO MARCH 2021
Engineering Procurements commissioning & management of a multi discipline project interfacing with other units:
Mechanical works, piping prefabrication, steel structure installation. Non-core activities: E&I, civil, painting, insulation, scaffolding, lifting works
Other Highlights:
Installation of a suction scrubber. Gas manifold or a Distribution Header.
Three(3) Solar Mars 100 gas Compressor multiples stages, gas Cooler Fan, Discharge Scrubber, Condensate Gathering System, Corrosion Inhibitor Skid, Dehydration unit, Fuel(filter, with cartridge /coalesce) gas skid, Metering station, Blow down Flares.
Utilities: Instrument air units, Fire suppression System, RO unit, Power Substation. Commissioning and start-up activities, with Zero accident.
Operation and Maintenance of facility and hand over unit.